Access and Circulation Within a Plot
A-005 · R01 · Awaiting human acceptance
On this page
A route that reaches a plot still has to reach the building. Inside the plot, the route must remain wide enough for its purpose, including access to the rear for firefighting where required. At a road junction, visibility also limits what can occupy the corner.
From the road to the building #
Access means a way of entering a building, plot or land. For the route to a building within a plot, the minimum clear width is 3 m. The path must be open to the sky. Only a canopy, balcony, weatherboard or chajja at least 2.50 m above ground may overhang it. It must be paved, drained and adequately lit. New work cannot narrow a route serving an existing building below the prescribed minimum. The site plan shows the entire access area distinguished by colour and description. [Regulations 2(11) and 4.2(a)–(e), (h).]
Steps, ottas and raised platforms are generally excluded from the path. Where the road and entrance are at different levels, steps or a ramp may bridge the difference. Steps need treads of at least 30 cm, risers no higher than 20 cm and adequate parking nearby. A driveway ramp must be flatter than 1 in 6 and a pathway ramp flatter than 1 in 12. [4.2(c), (f).]
When a fire vehicle needs access to the rear #
A building with no side setbacks, or with 1.5 m or less on both sides, requires a clear route through the property to the rear. Regulation 4.2(g) specifies 4.5 m clear width for a non-high-rise building and 6 m for a high-rise. The route must remain unobstructed. No part of the building may overhang it below 4.5 m, and an arch or covered gate needs 5 m clear headroom.
For buildings meeting the Table IV side and rear setbacks, 4.2(g) removes its ordinary rear-route requirement. For high-rises it retains at least 6 m or the applicable setback, whichever is greater, on at least one side. It also excepts plots covered by 4.7 from its rear-access provision. See Setbacks, Building Lines and Projections for the narrow-frontage conditions.
High-rise buildings, defined in Regulation 2(20A)(h) as buildings 15 m high or more, are subject to the specific approach and open-space rules in Regulation 15.1.2. These take precedence over the corresponding requirements in 4.2(g) and 4.4.2. Its abutting main street must be at least 10 m wide. The approach and open spaces on all sides must be at least 6 m wide, hard-surfaced, motorable, clear of obstructions and projections, and capable of carrying a 45-tonne fire engine. A turning radius of at least 9 m is required. The layout must satisfy the Directorate of Fire and Emergency Services. For no side setbacks or setbacks of 1.5 m or less, the through-building route must serve all sides and clear the lowest structural member by at least 5 m. The plot entrance must be at least 6 m wide, with the gate folding back against the wall and at least 5 m clearance if built over. [2(20A)(h), 15.1.2(a)–(c).]
Visibility at road intersections #
The sightline joins points on the adjacent road right-of-way edges, measured from their intersection at the corner of the effective plot. Nothing may extend beyond that line into the visibility area. Buildings, walls, hoardings and other development must keep the field of sight clear up to 4.5 m above the adjoining road level. Existing natural and man-made obstructions must be removed before the occupancy certificate application. [4.3, Table II and Chapter 28, Sketch 3.]
The distance along each edge is 10 m for road rights of way over 30 m, 7.5 m for over 20 m through 30 m, 5 m for over 10 m through 20 m, and 4 m for roads less than 10 m wide. Editor’s note. Table II prints strict inequalities on either side of 10 m. It leaves the distance for exactly 10 m unresolved.
Road Access Requirements covers the approach to the plot. See the official GLDBCR, Regulations 2(11), 4.2–4.3 and 15.1.2 and Chapter 28, Sketch 3. Check the current official regulations and notified road right of way before relying on a site layout.