Site Constraints and Sloping Land
A-011 · R03 · Awaiting human acceptance
On this page
Site hazards and ground slope affect where development can take place and what survey information is needed. Goa’s building regulations restrict development on steep land, require levels or contours in specified cases, and address protection from liquefaction, cyclone storm surge and landslides.
What Counts as a Sloping Site? #
A sloping site is a site or plot with a gradient of more than 1:10 (Regulation 2(124)). A gradient of 1:10 means a vertical rise or fall of 1 m over a horizontal distance of 10 m. In percentage terms:
Slope (%) = (vertical change ÷ horizontal distance) × 100
1:10 = (1 ÷ 10) × 100 = 10%
1:4 = (1 ÷ 4) × 100 = 25%
For example, a 2 m rise over a horizontal distance of 20 m gives (2 ÷ 20) × 100 = 10%, or 1:10. A 5 m rise over the same distance gives (5 ÷ 20) × 100 = 25%, or 1:4. These examples explain gradient; they do not establish which direction or portion of an irregular plot determines its regulatory gradient.
At a slope of exactly 10% (1:10), the survey requirement applies (Regulation 4.10(a)), although the plot does not meet the definition of a sloping site, which requires a gradient greater than 10% (Regulation 2(124)).
How Steep Is Too Steep? #
Development is prohibited if the gradient exceeds 1:4, equivalent to 25% (Regulation 4.10(e)). A slope of exactly 25% does not exceed this limit. Other planning and safety requirements still apply.
Editor’s note — variable slopes: Regulation 4.10(e) and the sloping-site definition do not prescribe a general method for irregular plots. The TCP Board’s 189th-meeting guidelines, Item 8, add that narrow protrusions or folds need not be considered in isolation when measuring slope. This qualifies the assessment of local irregularities; it does not establish plot-average slope as a way to disregard steeper land. The measurement method and treatment of partly steep plots still need competent-authority clarification where they affect development.
When Are Levels or Contours Required? #
Levels or contour information is required by any of the following triggers; the plot-area triggers apply in addition to the gradient trigger (Regulation 4.10(a)–(c)).
Trigger | Threshold | Provision |
|---|---|---|
Plot gradient | 1:10 or more (≥10%) | |
Building operations | Plot area exceeds 1,000 m² | |
Subdivision of land | Plot area exceeds 10,000 m² |
Source: Regulation 4.10(a)–(c). “Exceeds” means greater than: exactly 1,000 m² or 10,000 m² does not trigger the corresponding area clause. A plot at either boundary can still require survey information because of its gradient.
For example, an 800 m² plot with a gradient of exactly 1:10 meets the gradient trigger. A 1,200 m² plot proposed for building operations meets the area trigger even if its gradient is below 1:10. These examples concern the survey requirement only.
Survey Format and Certification #
The plan may show block levels at 5 m centre-to-centre or, alternatively, contours at 1 m intervals. Block levels show elevations at spaced points; contours join points of equal elevation. The levels or contours should refer to a benchmark clearly shown on the site plan: a reference point for the survey elevations (Regulation 4.10(a), (d)).
A Chartered Surveyor or Civil Engineer must certify the contour plans and is responsible for their accuracy (Regulation 4.10(f)). This clause expressly refers to contour plans; it does not separately describe the certification of the alternative block-level plan.
For building applications on sloping sites, a separate provision requires a contour plan at 1 m intervals prepared by a Chartered Surveyor, Engineer or Architect (Regulation 3.2C1(f)). It describes preparation, while Regulation 4.10(f) specifies certification by a Chartered Surveyor or Civil Engineer. The block-level alternative in Regulation 4.10(a) does not expressly waive this separate application requirement. Plans and sections are also required for areas where cutting or filling exceeds 1.50 m in height from existing ground level (Regulation 3.2C1(e)).
Engineering, mining and quarrying applications have corresponding cutting/filling and contour requirements in Regulation 3.2C2(c)–(d); subdivision and private-street applications are addressed by Regulation 3.2C4, provisional-approval clauses (c)–(d), and Regulation 12.3. Full drawing packages depend on the type of application.
How Do Site Hazards Affect Development? #
A natural hazard is defined as the probability, within a specified period and area, of a potentially damaging natural phenomenon. Natural hazard prone areas are areas likely to experience moderate to high intensity earthquakes, cyclonic storms, significant flood flows or inundation, landslides, mudflows, avalanches, or more than one of these hazards (Regulations 2(87)–(88)).
The definition’s note identifies earthquake Seismic Zones III, IV and V under IS 1893; cyclone-prone coastal areas with wind velocities of 39 m/s or more under IS 875 Part 3; and flood-prone river plains in the Central Water Commission’s Flood Atlas of India. It also recognises flooding from intense rain, depressions, backflow and inadequate drainage identified through local development-plan surveys. Landslide-prone areas are identified in the State Disaster Management Plan by the Goa State Disaster Management Authority (Regulation 2(88), note). These references identify the hazards; they do not assign a particular plot a hazard classification in this article.
Liquefaction, Storm Surge and Landslides #
The following siting restrictions apply to building operations and subdivision wherever relevant (Regulation 4.1(b)). Liquefaction is a loss of soil strength during earthquake shaking; storm surge is a cyclone-related rise in sea level.
For a site found by the Goa State Disaster Management Authority to be liable to liquefaction at the area’s earthquake intensity, the building site must be away from the affected area and maintain the safe distance advised by that Authority, except where appropriate protection measures are taken (Regulation 4.1(b)(i)).
Where that Authority finds the proposed development falls in an area liable to storm surge during a cyclone, the building site must likewise be away from the affected area and maintain the advised safe distance, except where protection measures are adopted to prevent storm-surge damage (Regulation 4.1(b)(ii)).
In hilly terrain, the site plan should include landslide-prone areas on or near the site where identified in the Goa Disaster Management Plan. The building site must be away from them and maintain the safe distance advised by the Goa State Disaster Management Authority, except where protection measures are adopted to prevent landslides (Regulation 4.1(b)(iii)).
These clauses give no universal safe-distance figure or standard protective design. The specified hazard finding, Authority’s advice and appropriate protection remain material; the exceptions do not establish an unrestricted right to build on a hazardous site.
The disaster-management provision also addresses flood-prone and landslide-prone areas, and other non-developable areas identified in the State Disaster Management Plan or other plans prepared by the Goa State Disaster Management Authority. Its wording says that, “as far as possible”, buildings or structures shall not be permitted in those areas (Regulation 19). This qualification is part of the provision; it is not an automatic permission to develop a mapped hazard area.
Non-structural components are building components that do not contribute to structural stability; examples in the definition include infill walls in RCC frames, glass panes, cladding, parapet walls and chimneys. Regulation 2(89). Their classification does not establish that they are safe from the site hazards described above.
Protective works and structural safety also engage the Indian Standards and guidelines referenced in Regulation 3.6.2, including those for retaining walls and landslide-hazard mapping. Its note calls for the latest revision of a referenced standard unless a specific criterion is stated. Detailed structural and disaster-management requirements are separate from the siting rules described here.
Water Coming From Uphill #
A sloping-site plan may include proposals to divert natural water flow coming from uphill away from the building’s foundations (Regulation 4.1(b)(iv)). The clause uses “may” and provides no fixed drain size or diversion distance.
Related Planning Requirements #
Subdivision has additional slope provisions, including surveys for subdivision or private-street layouts and a restriction on developing portions steeper than 25% as usable plots. Its exception concerns subdivided plots approved before the regulations came into force (Regulation 12.3). That exception should not be read as a general exemption from Regulation 4.10(e). Detailed subdivision requirements belong with subdivision and plot layouts.
Building-height measurement on sloping land has specific provisions tied to different plinth levels and the location of road access; the sloping-site plinth-height note states a 1.50 m maximum (Regulation 6A.5(d)–(g), Note (1)). These rules concern building-height measurement, not the gradient limit. Farmhouses are not permitted on sloping land above 25%; they are to be located in flatter portions not exceeding 25%. Hill cutting is prohibited except for the stated plinth, foundation and footing work (Annexure XI, farmhouse conditions).
Road access, setbacks and permitted land use remain separate requirements. Satisfying the slope and survey provisions alone does not establish the amount of development permitted on a plot.
Hill Cutting and Filling Permissions #
Section 17A of the Goa Town and Country Planning Act requires prior written permission for cutting hilly or sloping land or filling low-lying land. For this section, the slope threshold includes exactly 10%; its low-lying-land definition uses a difference of 0.50 m or more below adjoining ground. This differs from the GLDBCR sloping-site definition, which starts above 10%. TCP’s published Section 17A procedure calls for the application alongside technical clearance or development permission, with contours, cutting/filling sections, drainage information and other supporting documents. Section 17A and TCP procedure.
The TCP Board’s 189th meeting, Item 8, finalised revised guidelines and directed the Chief Town Planner (Land Use) to implement them and inform branch offices. They retain the prohibition above 25%, distinguish cutting on 10–20% and 20–25% slopes, and address structural certification, drainage and protection. They are administrative guidance for permission decisions, not an amendment overriding the GLDBCR or the specific farmhouse restrictions. TCP Board minutes, 11 August 2023, Item 8, pp. 23–26.
Editor’s note — remaining hill-cutting uncertainty: The implementation direction is established by the minutes. Their continued unamended application, boundary treatment within the slope bands and proposal-specific permissions are not certified here. Neither those minutes nor a Section 17A permission establishes an exemption from Regulation 4.10(e).
Sources #
The Goa Land Development and Building Construction Regulations, 2010: definitions in Regulations 2(87)–(89) and 2(124); site-hazard provisions in Regulation 4.1(b); slope provisions in Regulation 4.10; and related Regulations 3.2C1–C4, 3.6.2, 6A.5, 12.3 and 19, and Annexure XI.