  1. Notary certification for low-risk residential buildings
  2. Unauthorised construction and minor deviations
  3. Government projects and earlier additional-FAR grants

Third-party certification of a qualifying low-risk residential building, regularisation of unauthorised work and approval of a Government project have separate eligibility tests and decision-makers. Paying a fee alone does not establish that work qualifies.

Notary certification for low-risk residential buildings #

A notary architect or engineer must be empanelled and registered. Annexure X applies to low-risk residential buildings on plots formed by a finally approved subdivision layout, including a partitioned plot forming part of such a layout. Maximum plot area and maximum built-up area are each 500 m². Height is limited to G+2 storeys including the stilt floor. The approving authorities must have finally approved the underlying subdivision. [2(90), 20.9 and Annexure X(1)–(2).]

Annexure X(3)(a) concerns issue of third-party or self technical clearance, development permission or completion order. The professional obtains conformity certificates, affidavits and structural liability or stability certificates as applicable, inspects where needed, remits infrastructure tax, signs the formats and plans or completion order for the local licence, keeps an application register and retains a complete set for designated-officer inspection. Under (3)(b), certification instead enables TCP or PDA to issue the order. The professional scrutinises, obtains the documents, inspects where needed, signs and submits the file to that authority, and keeps the register and record set.

In both routes the professional defends complaints and court cases arising from the orders. TCP/PDA disclaims the liability and disputes described in the annexure. After an opportunity to be heard the Chief Town Planner may remove a defaulting professional from the authorised register by order. Local licensing authorities must then cease honouring that professional’s certification. Applications, Drawings and Forms links the notary pathway to the ordinary form index. Chapter 26 uses E1/E2 for applications, E3/E4 for registration, E5 for conformity, E6/E7 for clearance and completion and E8 for refusal. [Annexure X(3)–(4).]

Unauthorised construction and minor deviations #

Under the separately headed regularisation provision printed as 22.4.(a), unauthorised construction of no more than 500 m² must fully conform to the regulations. On TCP/PDA recommendation, the local authority may regularise it with a compounding fee of at least three times the normal licence fee. Above 500 m² the compliant construction must pre-date 31 December 2020. TCP/PDA verifies that date from electricity or water bills, tax receipts or other evidence. The fee is six times the normal licence fee. Conservation-zone cases require Conservation Committee recommendation under the regime in Heritage and Conservation. CRZ cases require Goa Coastal Zone Management Authority approval first.

Regulation 22.5 concerns minor deviations arising from site conditions. The competent approval/NOC authority may regularise them if FAR, coverage and height are not affected beyond 5% of permissible limits. The excess is charged at double construction cost or the prevailing value of the excess FAR at regularisation, whichever is higher. The fee does not apply to the note’s height increase up to 5% or overall building shift reducing setbacks by no more than 5%, where there is no additional floor area and 13.1(b) is met. These figures cannot authorise an intended departure in advance.

Government projects and earlier additional-FAR grants #

Government departments and undertakings give written notice of intended building, land development or subdivision, submit the 3.2 documents and plans and obtain a local building licence. Section 3.11A specifies particular clearance and completion officers for designated public projects. [23, 3.11A.] Designated public projects follow the tailored decision-makers and the ordinary procedural provisions with necessary adaptations.

For Government, Government-owned bodies, local bodies and the specified housing or other Government schemes executed by or on behalf of Government, including PPP, Government may relax height and minimum setbacks on merit for larger public interest with recorded written reasons. Industrial processing and plant needs fall under a separate 22.4(a) power. New 22.4(c) permits Government to grant additional FAR to the projects covered by those two clauses at the fee specified in 6.1.2. Annexure XIII-A separately excludes GIDC industrial estates and industrial areas from its industrial category. Editor’s note. Their interaction and the current fee order remain unresolved.

Earlier additional FAR and height grants in PDA and non-PDA areas must be examined under 6.1.2(e) and regularised under that regulation. This concerns a prior grant; it does not substitute for the unauthorised-construction tests above. [24 November 2026 Gazette.]

See the official GLDBCR, Regulations 22.4–22.5, 23 and Annexure X. Check the current official regulations and applicable notifications before making a regulatory decision.