Approvals, Construction and Occupancy
A-028 · R01 · Awaiting human acceptance
On this page
A planning approval, building licence, completion order and occupancy certificate answer different questions. The planning decision precedes the construction licence. Completion and occupancy each require confirmation of the work actually built, even where only part of the building is to open.
Decisions, refusals and appeals #
TCP Department applications ordinarily have a 45-day disposal period from receipt, except cases requiring a Government or Conservation Committee reference, legal opinion or another agency’s approval. Failure of the district or taluka office to dispose of an application within the stipulated period is deemed refusal. Appeal lies to the Chief Town Planner within three months of deemed refusal. Government specifies the appeal fee, and the appellate authority has 45 days from receipt of the appeal memo. [3.6.1(a).]
The local body can grant a construction licence only after the relevant PDA Development Permission or TCP Technical Clearance. Grants use C1–C4. Applications, Drawings and Forms lists the associated application and certificate forms. The Chapter 26 index identifies C9 for PDA refusal, C10 for TCP refusal and C11 for local licence refusal. [3.7; Chapter 26.]
Changes during construction #
The permit holder must follow approved plans and conditions. A deviation concerns changes in approved height, coverage or FAR, and also an exterior change in a conservation zone. An addition includes increased coverage, FAR or height or reduced setbacks. Alteration includes a change of use or structural change. [2(12)–(13), (49).]
If the owner and signing professional consider a deviation within the regulations, it may be carried out and shown on drawings for revised approval as soon as possible, at latest when applying for occupancy. In a conservation zone prior Conservation Committee approval is required. Unlawful deviations can lead to revocation and proceedings. False statements, suppression or misrepresentation of material facts, and non-compliance are also grounds for revocation under the relevant Act. [3.8, 3.10.]
Sanction initially lasts three years and may be renewed by request letter for three years at a time, subject to the Act. Transfer with the property requires written intimation to the authority and confirmation. The applicant notifies the local body of commencement on D1 for building alignment. [3.9.]
Completion and occupation #
An erected, re-erected or materially altered building requires a whole or part Completion Order and the corresponding local Occupancy Certificate before occupation. In a PDA area A5 goes to the PDA for C5; in a TCP area A5 goes to TCP for C6. The application includes the signing professional’s B6 completion certificate, the structural engineer’s B5 stability certificate and as-built structural drawings, and revised drawings showing deviations where applicable. The local body then receives A6, the planning completion order and the same supporting certificates and drawings. C7 is the municipal occupancy form and C8 the panchayat form. [2(38)–(39), 3.11–3.11.1.]
Scrutiny and site inspection establish conformity with regulations, plans and conditions. Buildings under 15.2.1 require Fire Services clearance before applying for occupancy. Fire Safety and Life Safety sets out the triggers. Within five years the licensing authority carries out random post-occupancy audits of group housing, residential multi-dwelling and multistorey buildings. The checks concern clear traffic and parking circulation and changes of use, especially diversion of parking. The authority acts on misuse, including cancellation of trade licences in parking areas and restoration of parking. [3.11(b)–(c).]
For Government buildings designed by the PWD Chief Architect, the Chief Architect grants planning clearance and completion. For the specified local-body or GWMC material recovery and solid waste facilities, the designated municipal, panchayat or GWMC engineering authority grants the orders. Government may notify other officers for other public projects. Regulations 3.6–3.8, 3.10, 3.11 and 3.11.1 apply with necessary adaptations under 3.11A(b).
Earlier grants of additional FAR or height #
The 24 November 2026 Gazette requires examination of earlier additional FAR and height grants in PDA and non-PDA areas under 6.1.2(e) for regularisation. A prior grant cannot by itself establish the result of that examination. This provision concerns earlier grants. Unauthorised construction has separate conditions. For new grants, the order-specific fee must be paid before Technical Clearance.
See the official GLDBCR, Regulations 3.6–3.11A and Chapter 26. Check the current official regulations before making a regulatory decision.