A heritage restriction can apply because a property lies in a mapped conservation zone, because a building or precinct is listed or has intrinsic heritage value, or because the site is near a protected monument. The basis for protection determines who must consent and which works can be considered.

Conservation zones, listed properties and preservation areas #

Regulation 2(41) defines a conservation zone as an area shown in an Outline Development Plan or other plan for its architectural, historic, archaeological or heritage importance, natural or man-made, where development is subject to special rules and Conservation Committee approval. Annexure IX includes precincts, groups of buildings, sites, artifacts, public spaces, skyline, roofscape and vistas. It distinguishes heritage buildings, which can include a specific feature, site or ornament, from heritage precincts, which may cover groups, areas, streets, roofscapes and views. The Government may determine their status with Committee approval. [GLDBCR 2(41), Annexure IX item 1.]

The Government notifies the list. It can supplement, modify or delete entries after public objections and suggestions have been invited and considered. Annexure IX items 2 and 4 also allow application to unlisted buildings or precincts outside conservation areas if the Committee finds intrinsic heritage value. Planning Areas, Zones and Land Use explains the underlying planning designation.

In a preservation area, existing structures and uses may be maintained by repair under written permission. New development is barred by 6B.1.4(a) and prior permission is required before any demolition or development under 6B.1.4(b). The permission requirement does not itself relax the prohibition.

Development, repairs and change of use #

For development, redevelopment, repair or demolition in a designated Conservation Zone, the PDA or TCP Department refers the case to the Conservation Committee. Its decision binds the planning authority. Demolition, façade or compound-wall repairs, changes in colour, and other exterior changes need prior permission. A completion order from the planning authority is required. Annexure IX requires prior written Chairperson permission acting with the Committee for affected works, including additions, plastering, repainting, replacement of special features, partial demolition and engineering operations. [6B.1.1, 6B.1.7, 3.6.2(b), Annexure IX item 2.]

The normal application also includes two copies of proposed external elevations and compound-wall drawings, two sets of coloured postcard-sized photographs of the existing building if any and the neighbours on both sides, and the external colour scheme including compound walls. Annexure IX item 6(1) states a three-year heritage sanction with annual renewals. The competent authority grants the development permission after Committee consent. [6B.1.7 and Annexure IX items 6–7.]

Preservation favours existing compatible uses and context-matching maintenance or changes to façades of no aesthetic value or in very weak or dilapidated condition. Underlying zone uses are subject to conservation restrictions. Settlement-area household shops occupy less than 25% of the front façade under 6B.1.2(c). Regulation 6B.1.6(h) separately describes eligible household shops and professional offices up to one-quarter of frontage and one-tenth of coverage. Traditional trades, such as goldsmiths and crafts, may continue where allowed and without nuisance. Other unsanctioned uses are prohibited, including commercial uses in settlement zones outside the exceptions. The provisions use different metrics. Editor’s note. At exactly one-quarter of the facade, 6B.1.2(c) uses a strict limit even though 6B.1.6(h) permits up to one-quarter of frontage. The provisions do not settle the boundary by themselves. [6B.1.2–6B.1.3 and 6B.1.6(h).]

Religious works required by sacred texts or practices may qualify where consistent with the original structure, architecture, design and features, including buildings outside the list that the Committee considers of intrinsic heritage value. Repairs and internal modifications may retain existing coverage and FAR even above the normal limits. [Annexure IX item 2(3), 6B.1.6(i).]

Design and possible relaxations #

Where existing buildings, front parts or façades are retained for conservation, the Committee has scoped setback powers after physical verification and environmental consideration. Character streetscapes can justify relaxing the front setback, subject to the intersection provision for a desirable minimum up to 3 m. Existing side setbacks can be relaxed to 1.50 m, or to the boundary provided blank walls are invisible from the road. Frontages up to 10 m can have 1.50 m side setbacks with FAR limited to 100. Rear setback can be 3 m for buildings up to G+1 and 7.60 m. [6B.1.5.]

Rear access may be reduced to 3 m high and 2.5 m wide for aesthetics. For widths up to 10 m, courtyard minima are 2 × 2.5 m for a single storey and 2.5 × 3 m for two. Shop openings are rectangular or arched with hinged or folding shutters. Roofs use Mangalore-type tiles at 20–30°, with up to 25% flat roof allowed. Straight RCC chajjas should be avoided where possible in favour of sloping, tiled protection. Upper-floor cantilevers are excluded except open balconies with light railings. Overhead tanks are preferably screened at the rear or below a sloping roof. New work or added floors step back 2.50 m at each upper floor from the floor below, with relaxation possible to preserve the existing building-line height. [6B.1.6(a)–(j).]

The design guidance considers skyline, roof form, landform, vegetation, prominent façade features, building pattern and traditional activity. Annexure IX restricts high-rise development considered detrimental to heritage skyline, roofscape or landscape. The Government may alter or relax other regulations for preservation after consultation. Where losses are likely, the Chairperson must provide an opportunity to be heard. Existing public-body restrictive covenants continue, subject to the Annexure IX heritage conflict rule. [6B.1.8, Annexure IX items 2(5)–(10) and 7.]

A decision that deprives an owner or lessee of unconsumed FAR can give rise to a Development Rights Certificate under Annexure IX item 2(7), with extent determined in consultation and Government sanction required. Owners and lessees ordinarily repair their properties. A fund may cover public-interest repairs at the Chairperson’s discretion in consultation with the Committee.

Local development limits in Table IX #

Panaji area and printed plot band

Maximum coverage

Maximum FAR

Maximum height

Commercial, below 300 m²

70%

200

12 m, G+3

Commercial, 301–1,000 m²

60%

180

12 m, G+3

Commercial, above 1,001 m²

60%

180

12 m, G+3

Settlement, below 300 m²

70%

140

7.60 m, G+1

Settlement, above 301 m²

60%

120

7.60 m, G+1

Institutional, below 500 m²

60%

120

7.60 m, G+2 as printed

Institutional, upper band printed ‘above 501 to’

50%

100

7.60 m, G+2 as printed

Source. GLDBCR Table IX, Panaji. Special stepped additions can reach 15 m in commercial and 9 m in settlement areas. Existing 100% commercial coverage may be considered for a total FAR up to 200, case by case. The printed ranges contain gaps and an incomplete institutional upper band. Exact boundary values in those gaps require confirmation.

Margao area

Coverage and FAR

Maximum height

Setback and use

Central commercial

60%, FAR 80

G+2 upper floors, 9 m eaves, 10.50 m overall

Central commercial setbacks. Fully commercial use may be allowed.

Local commercial

60%, FAR 80

G+1 upper floor, 8 m eaves, 9.50 m overall

Settlement setbacks. Fully commercial use may be allowed.

Settlement

60%, FAR 80

G+1 upper floors, 7.60 m eaves

Settlement setbacks. Residential only.

Institutional

60%, FAR 80

G+2 upper floors

Settlement setbacks. Educational, religious, social service or residential only.

Source. GLDBCR Table IX, Margao. The central commercial area is along Rua Abade Faria from Gomantak Niketan Hall to ABC Club branch road. There, existing 100% coverage may be considered for total FAR up to 100, case by case. The local commercial area is Old Market from the traffic circle to the garden in front of the Old Gaol court building. The institutional area is the Holy Spirit Church area bounded by streets on all four sides, excluding the church square. Other areas are settlement.

How the listed grade affects changes #

Grade

Development implications

I

National or historic importance. Only essential, minimal internal or external works to strengthen or prolong life, preserving originality. Surrounding development protects views and setting. Statutory authority acts on Committee advice.

II A

Regional or local significance. Internal changes and adaptive reuse are generally allowed. External changes are scrutinised for the listed features. Statutory authority consults the Committee.

II B

Grade II A treatment, with possible compatible extensions or additional buildings on the plot, judged on façade, scale and height.

III

Townscape significance. Internal and external changes, reuse or compatible additions may be considered. Reconstruction may be allowed for structural danger, accidental fire or natural calamity, or to use permissible FAR where there is no other option. Special attributes are preserved unless absolutely necessary.

Source. GLDBCR Annexure IX, grading provisions. The Committee has 13 specified members and may co-opt up to two specialists. Its remit includes listings, design guidelines, relaxations, repairs, signage, reuse, TDR receiving areas, and directing removal of unauthorised work. Annexure IX separately provides for tenure, quorum, decision-making and conflicts of interest.

Protected monuments and the additional-development exclusion #

Regulation 6B.2(A) and Annexure IX item 2(b) require the prior central archaeological clearance described there for protected monuments and their notified surroundings, referring to 300 m and the Ancient Monuments and Archaeological Sites and Remains Act, 1958. Under the national monument law, sections 20A–20D distinguish the ordinarily prohibited first 100 m measured from the protected limit and the following 200 m regulated area, subject to applicable notifications and statutory exceptions. Routine construction in the prohibited area and permission for repair or renovation are distinct statutory questions. A state planning clearance does not confer the national permission. Regulation 6B.2(B) requires the State Archives and Archaeology or other designated authority’s NOC for state-protected monuments and within the stated 100 m or as the state law provides.

The printed monument lists in GLDBCR 6B.2, pp. 73–76, include the central and state sites and identify the state entries by locality and survey details where available. These are source lists for reference. Current notification, protected limits and the relevant authority determine coverage for a particular site.

Annexure XIII-A Note 3 bars additional FAR and height within a protected-monument buffer. The note does not set a separate distance or demonstrate that every conservation zone is a monument buffer. The applicable protection notification and boundary matter. See the 24 November 2026 Gazette and Floor Area Ratio.

Check the current official regulations and applicable standards before making a regulatory decision.